Solar energy in Cartagena
We design and install your complete solar system: from studying your consumption to commissioning and grid connection.
You generate your own energy during the day and the grid backs you up. Surplus energy is credited on your bill under Colombia's CREG 174 of 2021.
Besides saving, you store energy for power cuts. We size the battery bank for the backup hours you need.
For farms, islands and places without grid power: panels, batteries and an inverter that work on their own.
After installation, your system is connected to SUE, the platform of our strategic partner EXIA: fault alerts, monthly reports and preventive maintenance.
Discover EXIA monitoring →Solar systems delivered in Cartagena and the region.
38 kWp on-grid system
38 kWp
61.4 kWp on-grid system
61,4 kWp
24.9 kWp on-grid system
24,9 kWp
14.4 kWp on-grid system
14,4 kWp
5.4 kWp on-grid system
5,4 kWp
3.3 kWp off-grid system with batteries
3,3 kWpEnter your details and find out in seconds what capacity you need.
Figures are estimated from the consumption you reported and from regional irradiation averages. The final proposal requires a site visit and a review of your bill. An advisor will contact you.
Need one of our other service lines?
For IT support, networks, CCTV or electric vehicle chargers, use our contact form.
It depends on your consumption and whether you need batteries. The quote tool on this page gives you an estimate in seconds; the final proposal comes after the site visit.
With the self-generation (AGPE) permit, surplus energy is credited on your bill under CREG 174 of 2021. We handle the filing.
EXIA, our strategic partner, monitors it with its SUE platform and handles preventive maintenance.
Yes, across the Caribbean region: we have installed in Barú, Bayunca and Tierrabomba, among other places.